Responding to a government aircraft lease tender
State-owned carriers and government entities procure aircraft capacity through formal tenders — published, dated, with a defined bid window and an official submission channel. Most of what reaches a broker's inbox about them doesn't come from that channel.
The pattern worth knowing
A genuine state tender has a few fixed characteristics: it's published on an official government or airline procurement portal, it carries a specific tender number and closing date, and it names the submission route. When a "tender" instead arrives as a forwarded message through an intermediary chain, with no reference to the official portal and a request framed as urgent or exclusive, that's a reason to verify — not to disengage, but to check before committing any real work.
Verification is usually fast: the issuing carrier's own procurement or tenders page, or the relevant government e-procurement portal, will show whether a listing is currently open, and its actual closing date. A tender that closed weeks ago being represented as live today is the single most common mismatch.
What a credible bid actually documents
- The exact technical specification as published — aircraft type, age limits, engine variant, cabin configuration, delivery window — cross-checked word for word, not summarised from memory.
- A clear chain of mandate: who represents whom, in writing, before any commercially sensitive information changes hands.
- A single, disclosed fee structure — never two undisclosed sides of the same transaction.
Why this matters more than it looks
Technical specification mismatches between what's officially published and what circulates informally are a reliable early signal. Inconsistent seat counts, engine variants, or age limits between two versions of the "same" requirement usually mean one version was never checked against the source.
What we apply here
Qualification before sourcing, every time: identity of the principals, evidence of mandate, and — for a tender specifically — direct confirmation against the issuing entity's own published documentation. We would rather lose a day confirming a mandate than spend three weeks sourcing against a requirement nobody can actually award.
Sourcing against a state or institutional tender?
Send us the published reference and the specification. We confirm what's verifiable before any sourcing work starts.
Write to us →